This is the letter the Islander paper couldn't print because it was "more than one letter on the same topic".
Dear Editor,
I’m very thankful to VTran’s Secretary Neale Lunderville and Senator Dick Mazza for answering the questions I posed. It was refreshing to see government officials take time to inform the Grand Isle County community about what is going on with their drawbridge. I sincerely hope this openness and dialogue continue into the future.
I was glad to hear “there are no plans at this time, so there is nothing as of yet to report.” This means with things in the early stages, there is plenty of opportunity to involve the islands community in the planning process. After all, who knows their bridge better than the residents of Grand Isle County? County residents see beyond the structure of the bridge, to all that it represents and could be.
I personally feel that if there is to be a reconstruction, some sort of handicapped fishing access would be a good addition. With the little access road on the north side this would not be a far stretch, and surely help some good folks out. I’m sure Island residents have other insightful ideas of what could be done to the drawbridge during reconstruction. That’s why VTrans needs to have their engineers and planners hear Islanders speak before planning begins. Then good ideas can be incorporated into the plans from the start, not worked out as revisions, or worse too late.
The next ten to twenty years leave plenty of time to involve the residents of Grand Isle County in the future of their bridge. Engaging communities is what democracy is all about. I implore all members of the Grand Isle County community to contact VTrans immediately, and ask them to sponsor meetings for public input prior to planning. Talk to your governor, neighbors, selectboard members, and state representatives. Contact Secretary Lunderville and Senator Mazza, and hold them to their pledge that “as engineers concept what might be next for this bridge, Islanders and their local government officials will certainly be involved.”
Best regards,
Jason M. Brisson
North Hero, VT
Showing posts with label Grand Isle Drawbridge. Show all posts
Showing posts with label Grand Isle Drawbridge. Show all posts
Thursday, April 24, 2008
Tuesday, April 8, 2008
Must've Struck A Nerve Somewhere
Crossposted @ http://www.greenmountaindaily.com/
This letter was in response to a previous post/letter to editor by yours truly about the Grand Isle Drawbridge. It was in the local Islander paper. Must've struck a nerve if I elicited a response from Neale Lunderville, Douglas's Campaign Manager, I mean The Secretary of Transportation. Even more interesting that Senator Mazza a democrat also put his name on the letter. Don't worry boy's, you'll have my response coming your way soon enough!
"To the Editor,
Work to rehabilitate the North Hero/Grand Isle Draw bridge is now complete. On behalf of everyone involved, we want to thank Islanders for their patience and cooperation during the past several months as crews worked on this important project.
We also want to thank Jason Brisson for his kind words in a recent letter to the editor regarding the men and women who worked on the bridge. Their efforts were indeed exemplary. Unfortunately the letter distorted the process by which the Agency of Transportation will plan future bridge work, and we would like to take a moment to set the record straight.
Throughout the process that led to the recent emergency repair, the local Select Boards and town managers were kept in the loop. Agency of Transportation engineers offered to travel to the islands to meet with selectmen during public meetings, but the boards instead elected to be kept abreast through phone calls, letters and e-mails. There was always a standing offer to attend a public meeting if selectmen believed that necessary.
Mr. Brisson's letter asked what's next? He then questioned why he has yet to hear about future bridge repairs, and why there have been no public meetings to inform Islanders about the Agency's plans.
The answer is simple: there are no plans at this time so there is nothing as of yet to report. The rehabilitation that was just completed will keep traffic moving safely over this important bridge for the next decade or two.
VTran's staff put significant time and resources into the bridge rehabilitation that was just completed. The work was done during one of the most difficult winters in memory and completed in time for the upcoming nautical season. The paint is barely dry. As engineers concept what might be next for this bridge, Islanders and their local government officials will certainly be involved.
Neale Lunderville,
Secretary Agency of Transportation
Dick Mazza,
Senator Grand Isle"
This letter was in response to a previous post/letter to editor by yours truly about the Grand Isle Drawbridge. It was in the local Islander paper. Must've struck a nerve if I elicited a response from Neale Lunderville, Douglas's Campaign Manager, I mean The Secretary of Transportation. Even more interesting that Senator Mazza a democrat also put his name on the letter. Don't worry boy's, you'll have my response coming your way soon enough!
"To the Editor,
Work to rehabilitate the North Hero/Grand Isle Draw bridge is now complete. On behalf of everyone involved, we want to thank Islanders for their patience and cooperation during the past several months as crews worked on this important project.
We also want to thank Jason Brisson for his kind words in a recent letter to the editor regarding the men and women who worked on the bridge. Their efforts were indeed exemplary. Unfortunately the letter distorted the process by which the Agency of Transportation will plan future bridge work, and we would like to take a moment to set the record straight.
Throughout the process that led to the recent emergency repair, the local Select Boards and town managers were kept in the loop. Agency of Transportation engineers offered to travel to the islands to meet with selectmen during public meetings, but the boards instead elected to be kept abreast through phone calls, letters and e-mails. There was always a standing offer to attend a public meeting if selectmen believed that necessary.
Mr. Brisson's letter asked what's next? He then questioned why he has yet to hear about future bridge repairs, and why there have been no public meetings to inform Islanders about the Agency's plans.
The answer is simple: there are no plans at this time so there is nothing as of yet to report. The rehabilitation that was just completed will keep traffic moving safely over this important bridge for the next decade or two.
VTran's staff put significant time and resources into the bridge rehabilitation that was just completed. The work was done during one of the most difficult winters in memory and completed in time for the upcoming nautical season. The paint is barely dry. As engineers concept what might be next for this bridge, Islanders and their local government officials will certainly be involved.
Neale Lunderville,
Secretary Agency of Transportation
Dick Mazza,
Senator Grand Isle"
Wednesday, March 26, 2008
Letter To Editor About Grand Isle Drawbridge
crossposted @ www.greenmountaindaily.com
So the long anticipated, short-term fix to the Grand Isle Drawbridge has been completed. Where once traffic traveled over rust, the metal is bare and bright. No longer do Islanders traveling north and south have to worry about dropping through into the lake. VTrans did a good job of facilitating a solution, but most of the credit belongs to Engineers Construction Inc.
The workers from ECI were diligent in their work in spite of all sorts of adverse weather conditions, from rain, wind, snow, and extreme cold to a mini ice storm. After the ice they had to break the whole bridge free, before restarting their work. All the while, cars trooped north and south only a few feet away. That crew certainly worked hard for the money they earned.
Now that this chapter has closed in the story of our drawbridge, I wonder what the next one holds. After all, this is still only a temporary fix, and I have yet to hear what the state plans to do next. For that matter has anyone in the Islands heard anything? Of course not!
There have been no public meetings on the future of the bridge. The state and VTrans are having their little meetings down in Montpelier, behind closed doors, without any input from islanders. It's apparent that they only care to do what they want, not what we want. Where is our senator, where are our representatives?
Islanders please let you voices be heard! Talk to Senator Mazza, and Representatives Trombley and Johnson, voice your concerns. Don't stop there! Contact the governor, VTrans, your local selectboard, your neighbors! Islanders need to be heard on a subject near and dear to their hearts, their drawbridge, our input is important!!
So the long anticipated, short-term fix to the Grand Isle Drawbridge has been completed. Where once traffic traveled over rust, the metal is bare and bright. No longer do Islanders traveling north and south have to worry about dropping through into the lake. VTrans did a good job of facilitating a solution, but most of the credit belongs to Engineers Construction Inc.
The workers from ECI were diligent in their work in spite of all sorts of adverse weather conditions, from rain, wind, snow, and extreme cold to a mini ice storm. After the ice they had to break the whole bridge free, before restarting their work. All the while, cars trooped north and south only a few feet away. That crew certainly worked hard for the money they earned.
Now that this chapter has closed in the story of our drawbridge, I wonder what the next one holds. After all, this is still only a temporary fix, and I have yet to hear what the state plans to do next. For that matter has anyone in the Islands heard anything? Of course not!
There have been no public meetings on the future of the bridge. The state and VTrans are having their little meetings down in Montpelier, behind closed doors, without any input from islanders. It's apparent that they only care to do what they want, not what we want. Where is our senator, where are our representatives?
Islanders please let you voices be heard! Talk to Senator Mazza, and Representatives Trombley and Johnson, voice your concerns. Don't stop there! Contact the governor, VTrans, your local selectboard, your neighbors! Islanders need to be heard on a subject near and dear to their hearts, their drawbridge, our input is important!!
Friday, March 21, 2008
VTrans Does Have Successes
crossposted @ www.greenmountaindaily.com
Today, 3/21/08 the Grand Isle Drawbridge was reopened to two-way traffic, no more one way! This was a VTrans success as the bridge is the heart of Grand Isle County, the connection between all 5 towns. Finished well before the navigational season on Lake Champlain begins, with north and south of the bridge still frozen.
A big kudos to the diligent crew from Engineers Construction Inc, who was contracted for the repair. They worked through extreme cold, wind, snow, driving rain, and a mini-ice storm. After the ice they had to break apart everything that had frozen to the bridge before they could recommence their work. Everyone is now safer who travels over the bridge, even is it is only a temporary fix. A more permanent replacement will be needed in the future.
Without this drawbridge Grand Isle County would literally be divided into a north and south. VTrans did a hell of a job formulating a plan and enacting it. People no longer have to worry about dropping through into the lake when they pass over the bridge!!
Today, 3/21/08 the Grand Isle Drawbridge was reopened to two-way traffic, no more one way! This was a VTrans success as the bridge is the heart of Grand Isle County, the connection between all 5 towns. Finished well before the navigational season on Lake Champlain begins, with north and south of the bridge still frozen.
A big kudos to the diligent crew from Engineers Construction Inc, who was contracted for the repair. They worked through extreme cold, wind, snow, driving rain, and a mini-ice storm. After the ice they had to break apart everything that had frozen to the bridge before they could recommence their work. Everyone is now safer who travels over the bridge, even is it is only a temporary fix. A more permanent replacement will be needed in the future.
Without this drawbridge Grand Isle County would literally be divided into a north and south. VTrans did a hell of a job formulating a plan and enacting it. People no longer have to worry about dropping through into the lake when they pass over the bridge!!
Labels:
ECI,
Grand Isle County,
Grand Isle Drawbridge,
VTrans
Subscribe to: